RPLAD / HL-LHC35A-10V |
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
+ |
|
BC: 92755 BC: 92770 |
|
Project Mandate |
Milestone |
Activities Budget |
Functional Specif. |
ECR | ||
|---|---|---|---|---|---|---|---|---|---|---|
+ |
[±120 A; ±10 V] FGC2 |
|
|
Project Mandate |
Milestone Plan |
Activities Budget |
Functional Specif. |
Project Management Control Board
| R2E-HL-LHC(60;120)A | indico | apt | prjct | EDMS top - mgt - elec - prod | ITEM(s) rack.120A - cpm.120A - pwr.mod |
Mattermost Channel Links
| R2E-HL-LHC(60-120)A-10V Weekly Meeting Zoom Link |
Zoom Meeting Links
| Demo | Electrical demo board, to validate the topology and control strategy defined, EMC signatures. PCB can be internally routed if very simple, and if judged more efficient. | Power and regulation. Control (logic) or being controlled by a FGC controller is not required at this level. | 01 | |
| Prototype | Power Converter Prototype created to validate the functional technical specification, regarding electrical performances, control. The converter must be controllable by a FGC controller. | Converter cards and power elements must be located inside a mechanical frame, representing the final converter. PCBs are done through CERN service. | ||
| Rad / Elec Pre-Serie | Power Converters created to validate the work (quality, process, test) of the external companies before proceeding with the full series. Pre-series = Series most of the time, or with very few differences, considered as negligeable. The pre-series are tested at CERN using generic templates which will be applied to series. Pre-Serie, if modification are jugded too heavy, must be reworked to be identical to series. | All function included. | ||
| Serie | Power Converter final version. | All function included. | [op + sp] |
Version definition