Design & Operation Responsibles
Equipment Use / Goal
This device, designed internally will allow the test of AC-DC units including several on-line checks, like output voltage deviation for long period of burn-in test. Goal is to be able to trim dedicated loads at a given current and to be able to easily proceed with type test and with reception tests.
Equipment Architecture
Tester can be illustrated by:
Active-Load-Tester simplified Architecture / Topology .vsd
Key points of the tester are:
- A compact 19'' 3U unit, water cooled (silent), up to 10 units in a same rack.
- Up to 12 independant and adjustable load channels per unit. (12 = 4 trivolt power supplies to be tested)
- IChannel.max = 50A max
- VChannel.max = 48V max
- PChannel.max = 200W max
- A robust architecture, without any programming devices, flexibility being given by adjustable settings from the front panel.
Equipment Usage
|