Introduction
2 phases are forseen for the 287-Power Lab.
- Phase 1: Power Lab only.
- Standard Lab for repairing heavy Power Modules.
- Layout integrates a vestibule (sas), but door is let opened per default.
- Layout integrates boxes for clothes, with the possibility to wear them (change clothes process with 2 personnal cases).
- One "dust-remove" station.
- All material inside is marked and traced, and must not leave the lab.
- Phase 2: R2E/Rad Power Lab.
- Tranformation of the power lab into a Radiation Lab.
- vestibule (sas) integrates a PAD (personal ...), and door is locked per default; a card reader grants access only.
- Ventilation upgraded, filter adapated to radiation environnement.
- Entering the lab requires specific clothes.
- All material inside is marked and traced, all intervention are reported in an informatic system.
Planning
Projective Planning
Concepts
- Ventilation system has to put lab under pressure to avoid any risk of contaminated air to exit the lab.
- Ventilation system use specific high filtration filters for radiation purposes.
- All surfaces must be non porous, and should be easily washable.
- Evacuation scheme should be clear.
- A vestibule (sas) is mandatory. It integrates
- A safety lock access (card reader) to enter the lab.
- Dedicated boxes to change clothes (private => radiation protection).
- A radiaton pad (hand + feets) to ckeck contamination when exiting the lab.
Material
Contacts
List of CERN People involved / to contact.
- Radiation: Angelito Hervé (DGS/RP)
- Safety: Olivier Prouteau (DGS/SEE)
- Ventilation: Christian Bouvier (GS/SE)
- 867-R2E Lab: Sylvain KAUFMANN (TE-MPE), (budget code for 867: 96442)
|