Project
Project Management Control Board
Project Contracts
Project Contract (all current epc-lpc MS/IT)
Project Shared CERNBox Folder & emails Links
CERN Shared Folder links.
Purchasing guidelines
Purchasing Guidelines (Ex. EDH comment: "HLLHC 6B6 workunit: 244504")
Development Versions
Design Notes
- (2017-12-19) HL-LHC Meeting:
- Yves + Jean Paul + Miguel + Samer + Hugues + Vicente: HL-LHC2kA meeting.
- During this meeting (2kA oriented), the case of one R2E-HL-LHC60A with a crowbar handling up to [4; 5] kA pk was discussed. indico.
- It was decided that since this converter was only used some hours per year, the DCCTs would be placed inside the converter, not controlling purely the magnet load, to protect them from high peak current and to avoid over design.
- (2017-12-08) Emails Exchanges:
- Yves > Slawosz: R2E-DIM Cards to reproduce before it is obsolete and too late.
- A detail of the number of R2E-DIM cards which should be reproduced is given (CPLD is said to become obsolete). pdf.
- (2017-12-08) Emails Exchanges:
- Yves > Slawosz: R2E-DIM Cards to reproduce before it is obsolete and too late.
- A detail of the number of R2E-DIM cards which should be reproduced is given (CPLD is said to become obsolete). pdf.
- (2017-06-23) Emails Exchanges:
- Yves > Michele & Jean Paul: 60A cost estimation.