Search on site:  
 
 

topDesign Notes

  • (2016-09-20) Informal Meeting:
    • Raul => Jean Paul: cost estimation.
      • A cost estimate of the converter is given to Jean Paul, see email here. Cost - including DCCT and FGC? - uncertainty comes from DCCT choice related to precision requirements. Email .pdf

  • (2016-09-16) Informal Meeting:
    • Yves + Jean Paul + Michele: Project.
      • Raul is announced as the project leader.
      • A pre-plan / overview (spending profile, budget estimation) is due to 2016-09-30.
      • Know milestones are: SM18 (end of 2020), Finance Comittee (end of 2021), delivering the converters to HL-LHC (2024..2025.)
      • Design will be based on R2E-LHC600A-10V converter, trying to re-use power modules as much as possible, with control and protection modules to be reworked.
      • A synergy is certainly possible with new 60A and 120A to be re-designed (60A = 2x 60A//, and 120A = 3x 60A// - n+1 config).

  • (2016-06-22) Converter common mode (extraction):
    • Yves + Raul + Glyn Kirby + Arnaud Foussat + Juho Rysti.
      • Open discussion on earth location in the circuit, limitation of the current design regarding output common mode voltage, advices from both sides etc..Indico meeting: