HL-LHC | 6B.6
R2E-HL-LHC [±60 A; ±10 V]
R2E-HL-LHC [±120 A; ±10 V]
Y. Thurel
BC:     92764
BC:     92755
BC:     92770

APT:  HL6B.6
PLAN:  175377
INDICO:  8473
144.conv 60A.op
004.conv 60A.op*
124.conv 120A.op
*Ic:4.1kA@UR1/5
LS3 Project
Mandate
Milestone
Plan
Activities
Budget
Functional
Specif.
ECR

Project Management Control Board

topProject Shared CERNBox Folder & emails Links

Yves Benoit Baptiste

CERN Shared Folder links.

topMattermost Links

R2E-HL-LHC(60;120)A  |  indico  |  apt  |  prjct  |  EDMS  top  -  mgt  -  elec  -  prod  |  ITEM(s)  rack.120A  -  cpm.120A  -  pwr.mod

Mattermost Channel Links

topMeetings Links

topDevelopment Versions

Version Name Description Functions included / excluded Tracking Quantity
Demo Electrical demo board, to validate the topology and control strategy defined, EMC signatures. PCB can be internally routed if very simple, and if judged more efficient. Power and regulation. Control (logic) or being controlled by a FGC controller is not required at this level. PCB: EDMS
Unit: ---
01
Prototype Power Converter Prototype created to validate the functional technical specification, regarding electrical performances, control. The converter must be controllable by a FGC controller. Converter cards and power elements must be located inside a mechanical frame, representing the final converter. PCBs are done through CERN service. PCB: EDA
Unit: ---
[01;02]
Rad / Elec Pre-Serie Power Converters created to validate the work (quality, process, test) of the external companies before proceeding with the full series. Pre-series = Series most of the time, or with very few differences, considered as negligeable. The pre-series are tested at CERN using generic templates which will be applied to series. Pre-Serie, if modification are jugded too heavy, must be reworked to be identical to series. All function included. PCB: EDA
Unit: EPC.db
[10;20]
Serie Power Converter final version. All function included. PCB: EDA
Unit: EPC.db
[op + sp]

Version definition

topDesign Notes

  • (2017-12-19) HL-LHC Meeting:
    • Yves + Jean Paul + Miguel + Samer + Hugues + Vicente: HL-LHC2kA meeting.
      • During this meeting (2kA oriented), the case of one R2E-HL-LHC60A with a crowbar handling up to [4; 5] kA pk was discussed. indico.
      • It was decided that since this converter was only used some hours per year, the DCCTs would be placed inside the converter, not controlling purely the magnet load, to protect them from high peak current and to avoid over design.

  • (2017-12-08) Emails Exchanges:
    • Yves > Slawosz: R2E-DIM Cards to reproduce before it is obsolete and too late.
      • A detail of the number of R2E-DIM cards which should be reproduced is given (CPLD is said to become obsolete). pdf.

  • (2017-12-08) Emails Exchanges:
    • Yves > Slawosz: R2E-DIM Cards to reproduce before it is obsolete and too late.
      • A detail of the number of R2E-DIM cards which should be reproduced is given (CPLD is said to become obsolete). pdf.

  • (2017-06-23) Emails Exchanges:
    • Yves > Michele & Jean Paul: 60A cost estimation.
      • A cost estimate of the converter is given, see email here. pdf.